Ministry of Habitat, Infrastructure and Land Transport |19 October 2017

Did you know?

 

Infrastructure                              

 

  • By January 2018, the Ministry of Habitat, Infrastructure and Land Transport will have over 600 housing units under construction.

 

  • Present housing construction costs/rates varies between R4300 and R7250 per square metre.  This excludes the cost of infrastructure.

 

  • Contracts for the construction of houses awarded thus far are:

 

 

DISTRICT

NO OF UNITS

 

STATUS

 

CONTRACTOR

CONTRACT SUM (SR)

 

 

 

 

 

Anse Aux Pins

18

Design stage

-

-

Anse Boileau

18

Ongoing

Saifu

10.8M

Anse Royale

 

Pending

-

-

Baie Lazare

24

Ongoing

Qingjiang Group

17.6M

Baie St Anne Praslin

12

Award

Vijay Construction

7.1M

Takamaka

40

Ongoing

Mahe Design & Build

32M

Grand Anse Mahe

42

Ongoing

Mahe Design & Build

44M

Grand Anse Praslin

18

Design

-

-

Glacis

 

Pending

-

-

Cascade

24

Design

-

-

Point Laure

24

Design

-

-

Port Glaud

25

Design

-

-

Au Cap

24

Design

-

-

Anse Etoile

24

Design

-

-

English River

24

Design

-

-

Bel Ombre

12

Design

-

-

Beau Vallon

24

Design

-

-

Mont Buxton

36

Completed

Onivo

27.8M

Bel Air

24

Design

-

-

Plaisance

24

Design

-

-

Mont Fleuri

12

Design

-

-

La Digue

24

Design

-

-

Les Mamelles

8

Design

-

-

Roche Caiman

24

Design

-

-

ST Louis

40

Ongoing

Allied Builders

24M

Perseverance

36 + 64

ongoing

Saifu + Onivo

15.2 + 40.6M

  • The Infrastructure Department handles the preparation and implementation of all government housing projects in Seychelles.

 

  • The Infrastructure Department manages selected major government projects nationwide.  It does not draw plans or make planning applications for private individuals.  This is done by private draughtsman or architects practicing on the local market.

 

Contributed